Services
Specifications
Catalouge
Technical Information
Calculations
Animations
Photo Gallery
Haberler
 
 
  Lightning Rod And Maintanence Grounding Installation

Lightning Rod and Maintanence Grounding Installation; Your lightning protection systems, electric and grounding installations such as Radioactive Lightning Rods, Active Lightning Rods and Faraday Cage  should be inspected at least once in a year in accordance with the undermentioned statutes and spesifications.

According to “Grounding Regulations for Electirical Installations”, annex P which was prepared by Ministry of Energy and National Resources, entered into force in and published on 21.08.2001 in 24500 Official Newpaper, the undermentioned periods are given corcening the inspection, measurement and controls for various grounding installations in the operation period:

Electric production, transmission and distribution installations(except for the energy transfer and distribution lines): 2 years

For energy transfer and distribution lines: 5 years

For industrial facilities and trade centers:

Inspection and measurement of resistance concerning grounding: 1 year

Other inspections, measurement and controls concerning grounding: 2 years

For non-fixed installations:

For fixed operation items: 1 year

For non-fixed operation items: 6 months

The inspection, measurement and control period of the grounding installations where grounding work is associated with wet environment such as the ones specified in the Regulations About  Measurements to be taken on Business Sites and Works related to Flammable,Explosive Dangerous and Harmful Elements shall not exceed one year.

According to the article no. 2.11.2 of TS622, published by Turkish Standards Institutions on 04.12.1990 and entered into force with the Council of Ministers Decree of number 7/11204 on 4.1.1976; “Inspections should be made at regular intervals not exceeding 12 months. In order for seasons to change when the inspections are made, it is appropriate to determine a period less than 12 months.”

According to article no.47.15.1 of  “General Technical Spesifications, Chapter 7, Constructive Works Electric General Technical Spesifications” which was published by the Ministry of Public Works and Settlement “the maintanence of every kinf of lightning protection installation shall be made periodically once in a year.” Moreover, according to the Occupational Security Statute of the Ministry of Labor and Social Security it is mandatory to have lightning rod and grounding maintanence.

WE STRONGLY RECOMMED you to have lightning rod maintanence and grounding measurements in conformity with regulations and statutes for your life and property safety.

Works Conducted During Lightning Rod Maintanence

Radioactive lightning rod cowl signal test is conducted with radiation measurement device NEB-211.

Provided that active lightning rod is testable concerning its brands, cowl test is done.

By inspecting radioactive and active lightning rod installations physically, whether they comply with TS 622 is determined.

By measuring the resistance of lightning rod grounding installations, it is checked that whether they comply with the norms or not.

Except for thelightning rod installation; the grounding resistance of operating, protection, ups, transformer points are measured and checked if they are in conformance with the norms.

Works Conducted Following Lightning Rod Maintanence:

Following the inspection, the works is reported and signed by an member engineer of Chambers of Electical Engineer, who has SMM document.

The calibration documents of grounding equipment used for measurement and radiation measurement device, the SMM Document of the authourized Electrical Engineer, reports and invoice regarding the conducted work are posted to your address.  

If you are in need of information, price, exploration, etc. for your lightning protection systems, you can send e-mail to bakim@amper.com.tr  , or reach Maintanence Department via                             0 212 221 28 28               or fax to 0212 221 30 12. Our company is at your service in case of any such demand of yours.

PROMOTION:  The “lightning counter which is used to detect if your lightning rod installation exposed to lightning discharge and whose market value is 220,000YTL+VAT will be applied to companies having maintanence as 2007 year promotion with 50% discount. Should you demand to take advantage of the discount, please notify us via phone. 

 

 

 
Lightning Protections Systems
External Lightning Protection Systems
     The Simple Rod
     The Radioactive Lightning Rods
     Faraday Cage
     Stretched Line Method
     Lightning Rods
         Piezoelectric Lightning Rods
             Franklin France Lightning Rod ( SE )
         Electrostatic Active Lightining Rods
             The Tesla Lightning Rod
             Forend Petex Lightning Rod
             Forend EU Lightning Rod
             Active 2D Lightning Conductor
         Lightning Conductor Tester
         The Discharge Counter
         Lightning Rod Pole and Accessories
Surge Protection System
     Class B Surge Protection Devices
     Class C Surge Protection Devices
     Class D Surge Protection Devices
     Data Telephone Protection Systems
     Coaxial and Insulated Protection
Earthing
     Earthing Junction Conductor
     Ground Enhancement Materials
     Exothermic Welding
         Termokaynak Ürün Seçim Tablosu
Measurement Tools
Aircraft and Lighted Signal Systems
c
     The Effects of Lightning
     When Lightning Strikes
     Installation Of Lightning Rod
     Damages of Transient Overvoltage
     d
     d
     Equipotential Earthing System
     Grounding For Foundation
     Exothermic Welding and Application
   
Web Design PLUSGRUP